I know I haven't been around that much the last 5-6 weeks so I have to thank Jack, Helene and James for picking up some of the mod duties. And Pete for. . . being Pete. layful:
Since I started a new job in October I've been working out of the house - a lot! It made us realize that I needed some dedicated space. So let's finish the basement, right? Well that meant making a legal egress ($$$). And if we're doing that, shouldn't we install a drainage / sump pump system ($$$)? Long story short, about 30% more than our original estimate but the work is done - primarily thanks to an awesome contractor. I've worked out of the new space for a week now and it is great. I can separate my work and personal stuff easily and work without interrupting the family.
Picture below is my new digs - the full construction pics are here.
Since I started a new job in October I've been working out of the house - a lot! It made us realize that I needed some dedicated space. So let's finish the basement, right? Well that meant making a legal egress ($$$). And if we're doing that, shouldn't we install a drainage / sump pump system ($$$)? Long story short, about 30% more than our original estimate but the work is done - primarily thanks to an awesome contractor. I've worked out of the new space for a week now and it is great. I can separate my work and personal stuff easily and work without interrupting the family.
Picture below is my new digs - the full construction pics are here.